Development is a claim until the work proves it
SHOW THE WORK.
THEN EARN THE WORDS.
The Field Lab is the public development ledger: what MR POCKET is actively building, what remains open, and what has to be verified before release.
Focus before
product count.
Riverbone Scoop
Flagship recovery program. Physical prototype work is active. Ergonomics, field behavior, production material, durability, and manufacturing validation remain part of the release gate.
Riverbone Pan
Active recovery/classification program. Geometry is being translated into printable engineering while final field behavior, material, production process, and repeatability remain open.
Visible work.
No fake finish line.
Gold Belt
SYSTEM ARCHITECTURECarry roles and modular intent defined. Fit range, load testing, closures, and production validation remain open.
MRP—RM / 001Riverbone Mat
HYDRAULIC ARCHITECTUREFine-gold recovery architecture is being developed around active flow exchange, retention and clearing. Hydraulic behavior, material handling, repeatability and production validation remain open.
MRP—TS / 001TerraSense
GROUND-ACCESS ARCHITECTUREInterchangeable working-head architecture and field-configurable functionality are being developed. Locking interfaces, abuse testing, material selection and pinpointer integration remain open.
MRP—FC / 001FieldCore System
CLASSIFICATION / CARRYBucket chassis, stackable classifier logic and integrated field-carry architecture are being developed. Screen specifications, locking details, material and durability remain open.
MRP—PFK / 001Pro Field Kit
INTEGRATED FIELD SYSTEMSystem composition and field roles are being developed around a coherent recovery, classification and carry workflow. Included components, interfaces, production configuration and validation remain open.
MRP—SS / 001SureStand
PROSPECTOR FIELD STANDThe prospector’s stand role is defined. Deployment geometry, stability, mounting interface, repeated field cycles, contamination, packability and durability remain open.
MRP—BS / 001BootScraper
INTERFACE DEVELOPMENTGround-access role defined. Boot interface, retention, comfort, wear, and safety remain open.
MRP—TB / 001Tidebone Scoop
GEOMETRY + MATERIALWorking geometry direction defined. Load paths, buoyancy, abrasion, drainage, and joints remain open.
MRP / PIPELINEFull Equipment Index
Complete physical-development portfolioThe complete development portfolio remains visible without pretending every program has equal maturity.
POWERED BY RQVN / PLATFORMPowered by RQVN
SEPARATE SUPPORTING PLATFORMOptional identity, ownership, documentation, service, compatibility, and support infrastructure for eligible MR POCKET integrations. RQVN is not an MR POCKET product.
Development labels describe current work. They are not release-date estimates.
A rendering is not
a release.
- 01DEFINE
Field problem, user, environment, interfaces, failure conditions, measurable obligations.
- 02PROTOTYPE
Geometry, fit, ergonomics, behavior, assembly, and failure discovery.
- 03FIELD
Repeated real-use cycles across contamination, weather, terrain, and operators.
- 04PRODUCTION
Material, tooling, tolerances, quality control, packaging, service, supplier reality.
- 05RELEASE
Verified specifications, compatibility, warranty, support, and honest availability.
Every promise creates
a test.
Human factors
Grip, reach, balance, wrist position, gloves, fatigue, setup, cleaning, repeated use.
Mechanical
Static loads, impact, repeated cycles, joint wear, creep, edge wear, realistic failure modes.
Environment
Dirt, black sand, water, abrasion, UV, heat, cold, contamination, field storage.
System fit
Compatibility, attachment, stowage, detector awareness, interference, workflow integration.
Manufacturing
Material consistency, tolerances, assembly, quality gates, supplier capability, scale.
Ownership
Instructions, replacement parts, repair, warranty, support, product records, lifecycle reality.
Decisions belong
on the record.
Development briefs, design decisions, test methods, meaningful failures, and revisions belong here as evidence accumulates.
Bring us the failure
the industry ignores.
Field feedback is evidence, not a feature-request lottery. Tell us the exact tool, terrain, motion, failure, and workaround.
